|








MSL is certified to
ISO9001:2008
| |
| COMPANY
NEWS
TEL
: + 44 (0) 23 8027 5100
FAX
: + 44 (0) 23 8027 5200
www.msluk.net |
 |
|
LOAD TRANSDUCERS & TELEMETRY MONITORING SYSTEMS |
|
>>
HOME PAGE >> NEWS |
|
29th
May 2001
"Monitoring
Services (UK) Ltd complete Proof Load Testing at the new Saints
Football Stadium" |
| During the construction of the new
stadium's six lift shafts, it was required that the eyebolts, used in
their assembly, were proof load tested. Access to the eyebolts was
restricted which meant that only a light webbing strop and hook could be
attached to it. All of the heavy equipment - chain hoist, shackles and
load cell - were then lowered into the lift shaft and load applied
through anchor bolts at floor level. Using the MSL Radio Telemetry Link
enabled the load to be monitored at the top of the lift shaft so that
visual checks could be maintained for the duration of the tests.
For more information about our range of Radio
Telemetry Load Indicators click
here
Construction of the new stadium in St. Marys,
Southampton will be completed in time for the 2001/2002 season. For more
information on the progress of the building work see www.saintsnewstadium.co.uk |
|
For
more information on how MSL can help with your projects please contact :
MONITORING SERVICES (UK) LTD
Unit 14, Brickfield Trading Estate, Brickfield Lane, Chandlers Ford, Hampshire. United Kingdom SO53 4DP
Tel: +44 (0) 23 8027 5100
FAX: +44 (0) 23 8027 5200
e-mail : info@msluk.net
|
|